Date: Mon, 20 May 2002 00:53:40 -0400 (EDT)
From: Carl Shapiro <cshapiro@panix.com>
Huh. I was told that the wire wrap for the CADR was sent out to Augat
or some such company. But, there was a machine on the 9th floor which
was specially built to test all of the connections before the rest of
the machine was assembled.
That's probably what I saw.
pf